Regarding Inaccurate Tension, Over-tensioning, and Under-tensioning Solutions


Release time:

2025-07-19

Inaccurate pressure gauge readings, oil pump leaks, uncalibrated jack, and significant reading deviations.

Symptoms:

Inaccurate pressure gauge readings, oil pump leaks, uncalibrated jack, and significant reading deviations.

 

Causes:

 

- Jack and pressure gauge not calibrated on schedule

- Air ingress in the hydraulic system, aged seals

- Incorrect conversion of pressure gauge readings

 

Solution:

 

1. Calibrate the jack and pressure gauge as a set; recalibration is required every 6 months or after 200 tensioning cycles.

2. Bleed the system and inspect seals before tensioning; replace oil seals immediately if leakage is detected.

3. Calculate tensioning force strictly according to the calibration curve; do not rely on experience.

Latest News

The Overall Outlook for the International Bridge Engineering Industry

The bridge industry is transitioning from labor-intensive to technology-intensive, green and smart, and asset-service oriented. Chinese enterprises lead globally in ultra-long-span bridges, smart construction, and cost control, with vast potential for overseas expansion and the export of standards.

2026-05-28

Common Safety Hazards (Important to Note)

1. Personnel at the tensioning end → Do not stand directly behind the jack 2. Stranding rebound → Install protective barriers

2026-04-16

Solutions to Common Issues with Front Car Jacks (the 27t/30t models you asked about earlier)

Apply anchor release agent and replace the tool anchor regularly; retract slowly.

2026-03-19

Excessive retraction of the steel strand

Replace with qualified clamping plates Adjust the height of the stop plate

2026-01-21

Solutions for Poorly Compacted Grout, Voids, and Grout Leakage in Ducts

Ensure accurate cement slurry mix proportions and control the slump between 14 and 18 seconds. Use vacuum-assisted grouting with a negative pressure of -0.06 to -0.08 MPa.

2025-12-13

Solution for Asynchronous Tensioning (Tensioning at Both Ends)

Significant pressure difference between the two ends; the elongation values do not match.