Do you need any help? We are here to help!
Please contact us to provide you with satisfactory products and become a reliable supplier and service provider in the industry
Solutions for Excessive (Excessive/Insufficient) Elongation
Release time:
2025-08-20
Calculate theoretical elongation based on measured elastic modulus Check clamping plate hardness and stop plate height
Most Common and Most Problematic
Undersized (<-6%):
- Duct blockage, high friction
- Strand twisting, bundle jamming
- Misaligned anchor plate, uneven flaring
Solution:
- Pre-clear and clean the duct
- Feed strands straight without twisting
- Adjust anchor plate position to ensure proper alignment
Excessive (>+6%):
- Actual elastic modulus is too low
- Loose tensioning end, clamping plates not securely engaged
- Excessive retraction
Solution:
- Calculate theoretical elongation based on measured elastic modulus
- Check clamping plate hardness and stop plate height
- Hold the load for 3–5 minutes after tensioning before applying pressure to anchor
Latest News
The Overall Outlook for the International Bridge Engineering Industry
The bridge industry is transitioning from labor-intensive to technology-intensive, green and smart, and asset-service oriented. Chinese enterprises lead globally in ultra-long-span bridges, smart construction, and cost control, with vast potential for overseas expansion and the export of standards.
2026-05-28
Common Safety Hazards (Important to Note)
1. Personnel at the tensioning end → Do not stand directly behind the jack 2. Stranding rebound → Install protective barriers
2026-04-16
Solutions to Common Issues with Front Car Jacks (the 27t/30t models you asked about earlier)
Apply anchor release agent and replace the tool anchor regularly; retract slowly.
2026-03-19
Excessive retraction of the steel strand
Replace with qualified clamping plates Adjust the height of the stop plate
2026-01-21
Solutions for Poorly Compacted Grout, Voids, and Grout Leakage in Ducts
Ensure accurate cement slurry mix proportions and control the slump between 14 and 18 seconds. Use vacuum-assisted grouting with a negative pressure of -0.06 to -0.08 MPa.
2025-12-13
Solution for Asynchronous Tensioning (Tensioning at Both Ends)
Significant pressure difference between the two ends; the elongation values do not match.
2025-11-15