YDC Jack
Classification :
PRODUCT DETAILS
Tensioning Prestressed Tendons
Applying tension to steel strands, cold-rolled ribbed bars, and wire bundles to impart prestress to concrete structures, thereby enhancing tensile strength, crack resistance, and load-bearing capacity.
Anchoring and Locking
After tensioning is complete, the load is held in place; in conjunction with anchorage devices, the prestressed tendons are locked to maintain the designed tension.
Unanchoring and Relaxing
Loosening or releasing the prestressing tendons during construction adjustments, inspections, or demolition.
Testing and Calibration
Used for tensile testing of anchorages, steel strands, and anchor cables, as well as for calibrating jacks and hydraulic pumps.
Reinforcement and Jacking
Structural reinforcement, external prestressing, and jacking to correct misalignment of structural members.
Scope of Application (Applicable Scenarios)
1. Bridge Engineering (Primary Application)
- Precast T-beams, box girders, hollow slabs, U-beams
- Continuous beams, cast-in-place box girders, ramp bridges, elevated bridges
- High-speed rail/subway track beams and track slabs
- Cable-stayed bridges, suspension bridges, and tied-arch bridges (tensioning of anchor cables/cables)
2. Building Construction
- Long-span beams, floor slabs, and transfer floors
- Large-span structures such as stadiums, airports, and convention centers
- Construction of prestressed beams and slabs in high-rise buildings
- Reinforcement of existing buildings, external prestressing retrofitting
3. Water Resources and Hydropower
- Anchor cables for dams, gate piers, and spillways
- Prestressing for hydropower plant buildings and pressure pipelines
- Crack-resistant tensioning for reservoirs, aqueducts, and impermeable structures
4. Excavation Pits, Slopes, and Tunnels
- Tensioning of anchor cables and bolts for deep excavation shoring
- Anchoring for mountain slopes and landslide control
- Prestressing reinforcement for tunnel segments and linings
5. Prefabricated Component Production
- Pile pipes, utility poles, railway sleepers, and double-T slabs
- Pre-tensioned formwork and post-tensioned precast components
6. Other Projects
- Nuclear power plants, large storage silos, and heavy equipment foundations
- Static load testing, anchorage testing, and project acceptance
Applicable Tensioning Methods
- Post-tensioning: For cast-in-place or precast beams on site—insert tendons → tension → anchor (mainstream)
- Pre-tensioning: Tension tendons on the formwork first, then pour concrete, and finally apply tension
- External prestressing: Tensioning and reinforcement applied to the exterior of the structure
- Single-strand/bundle tensioning: Tensioning of individual steel strands or multiple strands as a single unit
Summary
Applications: Pulling steel strands, applying prestress, locking, releasing tension, and inspection.
Scope: Almost all prestressed concrete projects, including bridges, buildings, water conservancy projects, excavation slopes, tunnels, precast components, and structural reinforcement.
| Specification Model | Nominal Tension Force | Nominal Oil Pressure | Tension Cylinder Area | Hollow Shaft Diameter | Return Stroke Oil Pressure | Tension Stroke |
|---|---|---|---|---|---|---|
| YDC1500 | 1500 KN | 50 MPa | 30242 mm² | 90 mm | ≤ 10 MPa | 200 mm |
| YDC2000 | 2000 KN | 56 MPa | 35796 mm² | 105 mm | ≤ 10 MPa | 200 mm |
| YDC2500 | 2500 KN | 52 MPa | 48356 mm² | 125 mm | ≤ 10 MPa | 200 mm |
| YDC3000 | 3000 KN | 52 MPa | 57796 mm² | 135 mm | ≤ 10 MPa | 200 mm |
| YDC3500 | 3500 KN | 50 MPa | 70728 mm² | 150 mm | ≤ 10 MPa | 200 mm |
| YDC4000 | 4000 KN | 52 MPa | 76302 mm² | 160 mm | ≤ 10 MPa | 200 mm |
| YDC4500 | 4600 KN | 53 MPa | 87606 mm² | 170 mm | ≤ 10 MPa | 200 mm |
| YDC5000 | 5000 KN | 53 MPa | 93965 mm² | 185 mm | ≤ 10 MPa | 200 mm |
| YDC5500 | 5600 KN | 52 MPa | 107153 mm² | 192 mm | ≤ 10 MPa | 200 mm |
| YDC6000 | 6000 KN | 54 MPa | 110450 mm² | 205 mm | ≤ 10 MPa | 200 mm |
CUSTOMER VISIT
Our products sell well throughout China and are exported to countries and regions such as Cambodia, Malaysia, the Philippines, Dubai, and Colombia.
FACTORY WORKSHOP
With over 100 employees and more than 30 advanced processing and testing equipment, including CNC machine tools, CNC drilling machines, radial drilling machines, and cutting machines, the company boasts stable production capacity.
Factory workshop
Factory workshop
Factory workshop
Factory workshop
Factory workshop
Factory workshop
Factory workshop
Factory workshop
APPLICATION FIELD
Railway
Municipal
Airport
Water conservancy and hydropower
Bridge
Oil Extraction
FAQ
Q:How long is your delivery time?
Q:If accept OEM/ODM service to made product as per customer offering drawing?
Q:How can we trust your quality?
Q:Can the Buyers Visit the Factory?
RELATED PRODUCTS
GET A FREE QUOTE